Temporary loft floor and upper falsework. Note that the beams are fully load-bearing on the buttresses. When finished, the loft space will be divided into three sections: the east end (farthest away in photo) will be the sleeping area; the west end will be an office or maybe an extra bedroom; and the middle bay will be open to the full ceiling height (about 17' from the floor). The lofts are full stand-up height, and about 14' across at the floor level.
 
 
12

Upper vault under construction. Note the mesh and the rebar ribs over the falsework, and the "Bale-o-veyor" in the foreground (the other end is sitting on the bale pile).
 
 
13

Ridge being built. The arched doorway is the main entry. Gaps between the bales are skylights in the middle bay, which will be open to the peak.
 
 